[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94245":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94245,64,2,"多选题","委托规划设计规划设计的主要控制指标（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建筑间距",true,{"key":16,"text":17,"correct":18},"B","总用地面积",false,{"key":20,"text":21,"correct":18},"C","总建筑面积",{"key":23,"text":24,"correct":18},"D","总户数",{"key":26,"text":27,"correct":14},"E","居住人口密度","AE","规划设计的主要控制指标 容积率、建筑高度、建筑密度、绿地率、建筑间距、建筑后退、居住人口密度。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]