[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94244":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94244,64,2,"多选题","房地产开发项目在工程开工前，除完成勘察设计、规划报建、相关行政许可等工作外，还应为项目开工进行各种准备，包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","组织准备",true,{"key":16,"text":17,"correct":14},"B","现场准备",{"key":19,"text":20,"correct":21},"C","技术准备",false,{"key":23,"text":24,"correct":14},"D","物资和资金准备",{"key":26,"text":27,"correct":14},"E","销售准备","ABDE","此题考查工程建设准备。工程开工前，除完成勘察设计、规划报建、相关行政许可等工作外，还应为项目开工进行组织准备、现场准备、物资和资金准备。对房地产开发项目而言，还应进行销售准备。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]