[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94200":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94200,64,2,"多选题","工程接收证书颁发后，承包人负责清场，直至监理检验合格。竣工清场费用由承包人承担，清场内容包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工场地内残留的垃圾",true,{"key":16,"text":17,"correct":18},"B","发包人的设备和剩余的材料",false,{"key":20,"text":21,"correct":14},"C","临时工程的拆除，按合同清理、平整或复原场地",{"key":23,"text":24,"correct":14},"D","工程建筑物周边及附近的道路的施工堆积物",{"key":26,"text":27,"correct":14},"E","工程建筑物周边及河道的施工堆积物","ACDE","工程接收证书颁发后，承包人负责清场，直至监理检验合格。竣工清场费用由承包人承担．清场内容如下： (1)施工场地内残留的垃圾全部清理出场。 (2)拆除临时工程，场地按合同清理、平整或复原。 (3)承包人的设备和剩余的材料，包括废弃的施工设备和材料，撤离出施工现场。 (4)工程建筑物周边及其附近道路、河道的施工堆积物应全部清理。 (5)监理人指示的其他场地清理工作。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]