[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94178":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94178,64,2,"多选题","下列单位中，参与设计技术交底会的有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","设计人",true,{"key":16,"text":17,"correct":14},"B","发包人",{"key":19,"text":20,"correct":14},"C","监理人",{"key":22,"text":23,"correct":14},"D","施工承包人",{"key":25,"text":26,"correct":27},"E","造价咨询单位",false,"ABCD","此题考查设计技术交底会相关内容。发包人应当组织设计技术交底会，由设计人向发包人、监理人和施工承包人等进行设计交底，对工程设计意图、设计文件和施工要求等进行系统的说明和解释。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]