[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94171":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94171,64,2,"多选题","工程项目经济评价包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","环境效益评价",false,{"key":16,"text":17,"correct":18},"B","财务评价",true,{"key":20,"text":21,"correct":18},"C","国民经济评价",{"key":23,"text":24,"correct":14},"D","盈利能力分析",{"key":26,"text":27,"correct":14},"E","清偿能力分析","BC","工程项目经济评价包括：①财务评价（又称财务分析），是指在国家现行财税制度和价格体系下，从项目角度出发，计算项目范围内的财务效益和费用，分析项目的盈利能力、清偿能力和财务生存能力，对项目财务可行性进行的评价；②国民经济评价（又称经济分析），是指在合理配置社会资源的前提下，从国家经济整体利益角度出发，计算项目对国民经济的贡献，分析项目的经济效益、效果和对社会的影响，对项目在宏观经济上的合理性进行的评价。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]