[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94112":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94112,64,2,"多选题","下列设计阶段工程造价的计价方法中，属于单位建筑工程概算编制方法的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","扩大单价法",true,{"key":16,"text":17,"correct":14},"B","类似工程预决算法",{"key":19,"text":20,"correct":21},"C","实物法",false,{"key":23,"text":24,"correct":21},"D","分项详细估算法",{"key":26,"text":27,"correct":21},"E","生产能力指数法","AB","单位建筑工程概算编制方法包括：①概算定额法，也称扩大单价法。当初步设计达到一定深度、建筑结构方案已确定时，可采用概算定额法编制概算。②概算指标法。当初步设计深度不够、不能准确计算工程量，但工程采用的技术比较成熟且又有类似概算指标可利用时，可采用概算指标来编制概算。③类似工程预决算法。当工程设计对象与已建或在建工程相类似，结构特征基本相同，或者概算定额和概算指标不全，可以原有类似工程预决算为基础，按编制概算指标的方法，求出单位工程概算指标，再按概算指标法编制概算。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]