[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94082":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94082,64,2,"多选题","下列属于人工工日消耗量的内容有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","超运距用工",true,{"key":16,"text":17,"correct":14},"B","人工幅度差",{"key":19,"text":20,"correct":14},"C","基本用工",{"key":22,"text":23,"correct":24},"D","偶然用工",false,{"key":26,"text":27,"correct":14},"E","辅助用工","ABCE","本题考查人工工日消耗量的组成。预算定额中人工工日消耗量由分项工程所综合的各个工序施工劳动定额包括的基本用工、其他用工以及施工劳动定额同预算定额工日消耗量的幅度差三部分组成。其中，其他用工包括超运距用工和辅助用工两种。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]