[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94078":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94078,64,2,"多选题","预算定额中人工工日消耗量中的其他用工包括（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","超运距用工",true,{"key":16,"text":17,"correct":18},"B","人工幅度差",false,{"key":20,"text":21,"correct":18},"C","基本用工",{"key":23,"text":24,"correct":14},"D","辅助用工",{"key":26,"text":27,"correct":18},"E","非定额用工","AD","预算定额中的人工工日消耗量是指在正常施工生产条件下，生产单位假定建筑安装产品（即分部分项工程或结构件)必须消耗的某种技术等级的人工工日数量，它由分项工程所综合的各个工序施工劳动定额包括的基本用工、其他用工以及施工劳动定额同预算定额工日消耗量的幅度差三部分组成。 (1)基本用工； (2)其他用工。通常包括: 1)超运距用工是指预算定额的平均水平运距超过劳动定额规定的水平运距部分消耗的用工。 2) 辅助用工是指技术工种劳动定额内不包括而在预算定额内又必须考虑的工时消耗。 (3) 人工幅度差。 @##",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]