[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94010":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94010,64,2,"多选题","在绘制网络图阶段，分析各项工作的逻辑关系时，需要考虑的因素有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工程序",true,{"key":16,"text":17,"correct":14},"B","工艺技术",{"key":19,"text":20,"correct":21},"C","资金限制",false,{"key":23,"text":24,"correct":14},"D","组织安排",{"key":26,"text":27,"correct":14},"E","资源调配","ABDE","此题考查绘制网络图阶段相关内容。依据施工方案、有关资源供应情况和施工经验等，分析各项工作之间的逻辑关系，既要考虑施工程序或工艺技术过程，又要考虑组织安排及资源调配需要。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]