[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93911":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},93911,64,2,"多选题","建筑工程一切险的保险期终止时间可以是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程动工日",false,{"key":16,"text":17,"correct":18},"B","保险单规定的终止时间",true,{"key":20,"text":21,"correct":18},"C","建筑工程完毕移交给工程所有人时",{"key":23,"text":24,"correct":18},"D","工程所有人开始使用时",{"key":26,"text":27,"correct":14},"E","保修期满日","BCD","此题考查建筑工程一切险责任的终止时间。建筑工程一切险责任的终止有以下几种情况，以先发生者为准：①保险单规定的终止时间；②建筑工程完毕移交给工程所有人时；③工程所有人开始使用时。若部分使用，则该部分责任终止。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]