[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93908":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},93908,64,2,"多选题","工程风险估计的内容包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","风险事件发生的可能性估计",true,{"key":16,"text":17,"correct":14},"B","风险事件产生的后果估计",{"key":19,"text":20,"correct":14},"C","风险事件影响范围估计",{"key":22,"text":23,"correct":24},"D","风险事件发生的起源地估计",false,{"key":26,"text":27,"correct":14},"E","风险事件发生的时间估计","ABCE","此题考查工程风险估计内容。工程风险估计是建立在有效识别工程风险的基础上，运用概率论和数理统计方法，对工程建设各阶段的风险事件发生的可能性、可能产生的后果、影响范围和可能发生的时间等进行估计。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]