[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93906":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},93906,64,2,"多选题","下列时间点中，可以作为建筑工程保险责任开始时间的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工单位进入工地之日",false,{"key":16,"text":17,"correct":18},"B","动工之日",true,{"key":20,"text":21,"correct":18},"C","材料、设备运抵工地之日",{"key":23,"text":24,"correct":14},"D","施工招标完成之日",{"key":26,"text":27,"correct":14},"E","工地施工准备开始之日","BC","此题考查建筑工程一切险责任的开始时间。建筑工程一切险的保险期限开始有两种情况，即自工程破土动工之日起或自被保险项目原材料等卸至工地时起，两者以先发生者为准。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]