[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93608":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},93608,64,2,"多选题","按照概算法分类，建设投资估算中应包括的内容有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","固定资产费用",false,{"key":16,"text":17,"correct":14},"B","无形资产费用",{"key":19,"text":20,"correct":21},"C","工程费用",true,{"key":23,"text":24,"correct":21},"D","工程建设其他费用",{"key":26,"text":27,"correct":21},"E","预备费","CDE","按照概算法分类，建设投资估算中应包括工程费用、工程建设其他费用和预备费。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]