[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93598":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},93598,64,2,"多选题","分部分项工程量清单的要件有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","项目编码",true,{"key":16,"text":17,"correct":14},"B","项目名称",{"key":19,"text":20,"correct":14},"C","项目特征",{"key":22,"text":23,"correct":14},"D","计量单位",{"key":25,"text":26,"correct":27},"E","工程量计算规则",false,"ABCD","本题考核的是分部分项工程量清单的编制。分部分项工程量清单应包括项目编码、项目名称、项目特征、计量单位和工程量五个要件。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]