[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93595":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},93595,64,2,"多选题","下列费用属于措施费的有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","二次搬运费",true,{"key":16,"text":17,"correct":14},"B","安全文明施工费",{"key":19,"text":20,"correct":21},"C","工具用具使用费",false,{"key":23,"text":24,"correct":21},"D","检验试验费",{"key":26,"text":27,"correct":14},"E","夜间施工","ABE","CD属于企业管理费。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]