[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93509":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},93509,64,1,"单选题","价值工程中要努力降低的成本是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","购置成本",false,{"key":16,"text":17,"correct":14},"B","使用成本",{"key":19,"text":20,"correct":21},"C","寿命周期成本",true,{"key":23,"text":24,"correct":14},"D","生产成本","此题考查对价值工程成本的理解。价值工程中的成本是指产品在全寿命期内所需支出的全部费用。全寿命期是指研究对象从研究开发、设计制造、用户使用直到报废为止的全部时间。从用户角度而言，寿命周期成本可以表达为生产成本和使用成本。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]