[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93439":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},93439,64,1,"单选题","下列属于房地产开发前期准备工作的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","取得建设用地使用权",true,{"key":16,"text":17,"correct":18},"B","分析市场宏观环境",false,{"key":20,"text":21,"correct":18},"C","进行财务评价",{"key":23,"text":24,"correct":18},"D","加强施工巡查监督","前期准备是指房地产投资决策后至开发建设前需要完成的一些准备工作，主要包括：①取得建设用地使用权；②委托场地勘察和规划设计；③申请规划设计方案审查和建设工程规划许可；④工程建设准备；⑤申请施工许可。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]