[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93438":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},93438,64,1,"单选题","房地产开发建设的施工管理过程中，关于质量控制工作的说法，错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程开工前要求施工单位编制详细的施工组织设计",false,{"key":16,"text":17,"correct":18},"B","鉴定证明材料相关单位留存，无须报建设单位审核",true,{"key":20,"text":21,"correct":14},"C","对于关键部位施工，要提前制定具体的施工方案、施工技术保证措施",{"key":23,"text":24,"correct":14},"D","对影响工程质量的关键部位设质量管理点，并设专人负责","为了把质量控制工作落到实处，应要求施工单位建立可行的质量保证体系并严格执行。工程开工前要求施工单位编制详细的施工组织设计，对于重大或关键部位施工，以及新技术新材料的使用，要提前制定具体的施工方案、施工技术保证措施，以及新技术新材料试验，鉴定证明材料报建设单位、项目监理机构审核。对影响工程质量的关键部位设质量管理点，并设专人负责。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]