[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93426":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},93426,64,1,"单选题","下列房地产开发项目管理工作中，一般应先开展的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","选择工程施工单位",false,{"key":16,"text":17,"correct":14},"B","选择材料.设备供应商",{"key":19,"text":20,"correct":21},"C","选择工程勘察设计单位",true,{"key":23,"text":24,"correct":14},"D","选择工程监理单位","考察房地产开发项目管理的阶段。房地产开放项目管理的阶段第一步是工程建设准备，在该阶段，需要完成施工现场勘察与施工图设计，因此本题答案为C。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]