[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93241":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},93241,64,1,"单选题","开工通知发出后，尚不具备开工条件的，以( )为开工日期。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开工通知载明的开工日期",false,{"key":16,"text":17,"correct":18},"B","开工条件具备的时间",true,{"key":20,"text":21,"correct":14},"C","实际进场施工时间",{"key":23,"text":24,"correct":14},"D","协商确定的时间","此题考查开工日期认定。当事人对建设工程开工日期有争议的，人民法院应当分别按照以下情形予以认定：开工日期为发包人或者监理人发出的开工通知载明的开工日期；开工通知发出后，尚不具备开工条件的，以开工条件具备的时间为开工日期；因承包人原因导致开工时间推迟的，以开工通知载明的时间为开工日期。承包人经发包人同意已经实际进场施工的，以实际进场施工时间为开工日期。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]