[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93153":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},93153,64,1,"单选题","初步可行性研究是介于投资机会研究和详细可行性研究之间的工作，投资估算误差为（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","±30%",false,{"key":16,"text":17,"correct":18},"B","±20%",true,{"key":20,"text":21,"correct":14},"C","±10%",{"key":23,"text":24,"correct":14},"D","±5%","此题考查初步可行性研究。初步可行性研究是介于投资机会研究和详细可行性研究之间的工作，研究结果要形成初步可行性研究报告，考前超压卷，金考典软件考前更新，下载链接 www.jinkaodian.com 投资估算误差为±20%，所需费用占总投资比例为0.25%~1.5%。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]