[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93149":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},93149,64,1,"单选题","可行性研究报告报告内容及结果的真实性、可靠性、准确性评估不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目建设必要性评估",false,{"key":16,"text":17,"correct":14},"B","项目建设条件评估",{"key":19,"text":20,"correct":14},"C","项目环境影响评估",{"key":22,"text":23,"correct":24},"D","项目建设期限评估",true,"报告内容及结果的真实性、可靠性、准确性评估： (1)项目建设必要性评估。 (2)项目建设条件评估。 (3)项目环境影响评估。 (4)技术方案、设备方案和工程方案评估。 (5)投资估算与资金筹措评估。 (6)项目效益评估。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]