[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93043":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},93043,64,1,"单选题","根据《建设工程工程量清单计价规范》(GB50500--2013)，办理工程竣工结算与支付时，承包人首先要提交（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竣工结算文件",true,{"key":16,"text":17,"correct":18},"B","竣工结算款支付申请",false,{"key":20,"text":21,"correct":18},"C","最终结清支付申请",{"key":23,"text":24,"correct":18},"D","工程计量结果确认书","根据《建设工程工程量清单计价规范》(GB 50500--2013)，办理工程竣工结算与支付时，承包人首先要提交竣工结算文件。合同工程完工后，承包人应在经发承包双方确认的合同工程期中价款结算的基础上汇总编制完成竣工结算文件，应在提交竣工验收申请的同时向发包人提交竣工结算文件。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]