[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93038":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},93038,64,1,"单选题","投标人在其他项目清单报价时，需按照招标人在其他项目清单中列出的金额填写的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","暂列金额",true,{"key":16,"text":17,"correct":18},"B","材料暂估价",false,{"key":20,"text":21,"correct":18},"C","计日工费用",{"key":23,"text":24,"correct":18},"D","总承包服务费","材料暂估价应按招标人列出的价格计人分部分项工程量清单中该材料的综合单价，而不是在其他项目清单报价时直接填写。计日工按照招标人列出的项目与数量，由投标人自主确定综合单价并计算计日工费用。总承包服务费由投标人自主确定。只有暂列金额在其他项目清单报价时，须按照招标人在其他项目清单中列出的金额填写。故选A。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]