[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-93023":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},93023,64,1,"单选题","在建设项目竣工财务决算中，反映了工程项目建成后新增固定资产、流动资产、无形资产和递延资产，财产交接依据的文件是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","基本建设项目概况表",false,{"key":16,"text":17,"correct":14},"B","基本建设项目竣工财务决算表",{"key":19,"text":20,"correct":21},"C","基本建设项目交付使用资产总表",true,{"key":23,"text":24,"correct":14},"D","基本建设项目交付使用资产明细表","基本建设项目交付使用资产总表(建竣决o3表)反映了工程项目建成后新增固定资产、流动资产、无形资产和递延资产，是财产交接的依据。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]