[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92998":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},92998,64,1,"单选题","某项目采用生产能力指数法估算拟建装置的投资。已建成类似装置的投资额为200万元，生产能力为20万吨；拟建装置的生产能力为25万吨。指数n的取值为1，综合调整系数为1．20，该拟建装置的投资估算额是（）万元。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","250",false,{"key":16,"text":17,"correct":18},"B","300",true,{"key":20,"text":21,"correct":14},"C","400",{"key":23,"text":24,"correct":14},"D","450","C=200×(25\u002F20)1×1．2=300(万元)。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]