[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92994":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},92994,64,1,"单选题","下列费用中．不应列入工程量清单中其他项目清单的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","专业工程暂估价",false,{"key":16,"text":17,"correct":18},"B","安全文明施工费",true,{"key":20,"text":21,"correct":14},"C","总承包服务费",{"key":23,"text":24,"correct":14},"D","暂列金额","本题考查的是工程量清单的组成：在其他项目清单中包含暂列金额、暂估价、计日工和总承包服务费，其中暂估价包括材料暂估价和专业工程暂估价。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]