[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92933":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},92933,64,1,"单选题","下列关于招标控制价说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","招标控制价是编制的招标工程的最低投标限价",true,{"key":16,"text":17,"correct":18},"B","国有资金投资的工程建设项目应实行工程量清单招标，招标人必须编制招标控制价",false,{"key":20,"text":21,"correct":18},"C","招标控制价由分部分项工程费、措施项目费、其他项目费、规费和税金组成",{"key":23,"text":24,"correct":18},"D","暂列金额应按招标工程量清单中列出的金额填写","招标控制价是指招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法，以及拟定的招标文件和招标工程量清单，结合工程具体情况编制的招标工程的最髙投标限价。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]