[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92930":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},92930,64,1,"单选题","下列关于投标报价的编制说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","暂列金额应按招标工程量清单中列出的金额填写",false,{"key":16,"text":17,"correct":18},"B","安全文明施工费可以自主确定",true,{"key":20,"text":21,"correct":14},"C","暂估价中的材料、工程设备暂估价应按招标工程量清单中列出的单价计人综合单价",{"key":23,"text":24,"correct":14},"D","规费和税金应按照国家或省级、行业建设主管部门的有关规定计算","措施项目中的总价项目金额应根据招标文件中的措施项目清单及投标时拟定的施工组织设计或施工方案自主确定。但其中的安全文明施工费必须按照国家或省级、行业建设主管部门的规定计算，不得作为竞争性费用。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]