[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92845":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},92845,64,1,"单选题","单代号网络计划中，关键线路的判定条件是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工作总时差为零的工作线路",false,{"key":16,"text":17,"correct":14},"B","工作自由时差为零的工作线路",{"key":19,"text":20,"correct":14},"C","时间间隔为零的工作线路",{"key":22,"text":23,"correct":24},"D","全由关键工作构成，且相邻工作之间时间间隔均为零的工作线路",true,"在单代号网路计划中，总时差最小的工作为关键工作。将这些关键工作相连，并保证相邻两项关键工作之间的时间间隔为零而构成的线路就是关键线路。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]