[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92706":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},92706,64,1,"单选题","在双代号网络计划中，相邻两项工作之间的时间间隔等于( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","本工作的最早完成时间与本工作的最早开始时间的差值",false,{"key":16,"text":17,"correct":14},"B","本工作的最迟完成时间与其紧后工作的最迟完成时间的差值",{"key":19,"text":20,"correct":21},"C","本工作的最早完成时间与其紧后工作的最早开始时间的差值",true,{"key":23,"text":24,"correct":14},"D","工作的最早完成时间与其持续时间的差值","此题考查对相邻两项工作之间的时间间隔的理解。双代号网络计划中，相邻两项工作之间的时间间隔是指本工作的最早完成时间与其紧后工作最早开始时间之间可能存在的差值。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]