[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92512":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},92512,64,1,"单选题","关于工程监理合同中委托人主要义务表述不正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","委托人应在收到预付款支付申请后28天内，将预付款支付给监理人",false,{"key":16,"text":17,"correct":14},"B","在紧急情况下，委托人代表或其授权人员可以当场签发临时书面指示",{"key":19,"text":20,"correct":21},"C","委托人应在收到中期支付或费用结算申请后的14天内,将应付款项支付给监理人",true,{"key":23,"text":24,"correct":14},"D","委托人要求监理人进行外出考察、试验检测、专项咨询或专家评审时，相应费用不含在合同价格之中","委托人应在收到中期支付或费用结算申请后的28天内,将应付款项支付给监理人。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]