[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92440":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},92440,64,1,"单选题","在实施施工监理过程中，发现存在安全事故隐患，情况严重的，其正确的处理方法是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","签发监理工程师通知单",false,{"key":16,"text":17,"correct":14},"B","要求施工单位整改",{"key":19,"text":20,"correct":21},"C","总监理工程师应签发工程暂停令，并应及时报告建设单位",true,{"key":23,"text":24,"correct":14},"D","应及时向有关主管部门报送监理报告","此题考查工程监理机构安全生产管理。项目监理机构在实施监理过程中，发现工程存在安全事故隐患时，应签发监理通知单，要求施工单位整改；情况严重时，应签发工程暂停令，并应及时报告建设单位。施工单位拒不整改或不停止施工时，项目监理机构应及时向有关主管部门报送监理报告。紧急情况下，项目监理机构可通过电话、传真或者电子邮件向有关主管部门报告，事后应形成监理报告。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]