[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92309":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},92309,64,2,"多选题","某分部工程的双代号网络计划如下图所示，图中的绘制错误有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","有多个终点节点",false,{"key":16,"text":17,"correct":18},"B","有多个起点节点",true,{"key":20,"text":21,"correct":14},"C","出现循环回路",{"key":23,"text":24,"correct":18},"D","有多余的虚工作",{"key":26,"text":27,"correct":18},"E","节点编号有误","BDE","此题考查双代号网络计划绘制规则。该网络计划绘制错误有：选项B有两个起点节点①②；选项D的⑧→⑨虚工作为多余虚工作；选项E的⑥→⑤虚工作节点编号有误，其箭尾节点编号大于箭头节点编号。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]