[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92107":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},92107,64,1,"单选题","以下不属于BIM技术应用于方案设计阶段的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","方案建模",false,{"key":16,"text":17,"correct":18},"B","施工进度计划",true,{"key":20,"text":21,"correct":14},"C","建筑生态模拟分析",{"key":23,"text":24,"correct":14},"D","建筑可视化分析","此题考查BIM技术在方案设计阶段的应用。思维的随意性和连贯性在建筑设计的方案构思阶段很重要，因此，方便顺手的传统手绘草图仍然不可替代，但BIM工具在方案建模、建筑生态模拟、建筑可视化分析方面有其独特作用。而施工进度计划属于BIM技术在工程施工阶段的应用。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]