[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92057":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},92057,64,1,"单选题","基于BIM的6D模型，其特点是附加了( )因素。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","进度计划",false,{"key":16,"text":17,"correct":14},"B","成本预算",{"key":19,"text":20,"correct":21},"C","可持续性",true,{"key":23,"text":24,"correct":14},"D","三维模拟","此题考查对BIM 6D模型的理解。BIM 6D模型中附加了可持续性因素，主要包括通过实时概念建模进行建筑能量分析，通过生态技术进行详细的能源分析，可持续元素跟踪，1EED跟踪等。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]