[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-92044":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},92044,64,1,"单选题","关于BIM技术在建设工程全寿命期的应用范围，不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","规划设计阶段",false,{"key":16,"text":17,"correct":14},"B","工程施工阶段",{"key":19,"text":20,"correct":21},"C","投资决策阶段",true,{"key":23,"text":24,"correct":14},"D","运营维护阶段","此题考查BIM技术在建设工程全寿命期的应用。BIM技术在建设工程全寿命期的应用范围包括规划设计阶段、工程施工阶段、运营维护阶段。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]