[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-91530":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},91530,64,1,"单选题","建设单位组织竣工验收前，应提前（）将验收的时间、地点及验收组名单书面通知质监站，并提交有关工作质量文件和质量保证资料。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1个工作日",false,{"key":16,"text":17,"correct":14},"B","2个工作日",{"key":19,"text":20,"correct":21},"C","3个工作日",true,{"key":23,"text":24,"correct":14},"D","5个工作日","建设单位组织竣工验收前，应提前3个工作日将验收的时间、地点及验收组名单书面通知质监站，并提交有关工作质量文件和质量保证资料。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]