[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-91497":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},91497,64,1,"单选题","房地产开发项目工程招标文件不包括（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","评标委员会组成人员",true,{"key":16,"text":17,"correct":18},"B","工程量清单",false,{"key":20,"text":21,"correct":18},"C","合同专用条款",{"key":23,"text":24,"correct":18},"D","合同通用条款","评标委员会组成人员名单在中标结果确定前应保密。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]