[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-91140":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},91140,64,1,"单选题","下列关于安装工程保险中安装项目的保险金额表述最为恰当的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","一般按约定的价值确定",false,{"key":16,"text":17,"correct":14},"B","一般按照工程完毕后的价格确定",{"key":19,"text":20,"correct":14},"C","一般按安装合同总金额确定",{"key":22,"text":23,"correct":24},"D","一般按安装合同总金额确定，待工程完毕后再根据完毕时的实际价值调整",true,"安装工程保险中安装项目的保险金额一般按安装合同总金额确定，待工程完毕后再根据完毕时的实际价值调整",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]