[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-91019":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},91019,64,1,"单选题","如果某工程关键线路实际进度比计划进度延误，应在未完成的工作中选择适当对象压缩其持续时间，选择的对象应是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","后续总时差小的非关键工作",false,{"key":16,"text":17,"correct":14},"B","后续总时差大的非关键工作",{"key":19,"text":20,"correct":14},"C","尚未完成的关键工作中资源强度大或直接费用率高的工作",{"key":22,"text":23,"correct":24},"D","尚未完成的关键工作中资源强度小或直接费用率低的工作",true,"当关键线路的实际进度比原计划进度拖后，应在尚未完成的关键工作中，选择资源强度小或直接费用率低的工作缩短其持续时间。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]