[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-90902":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},90902,64,1,"单选题","根据《建设工程工程量清单计价规范》，下列关于分部分项工程量清单的说法，不正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单的项目编码应采用12位阿拉伯数字表示",false,{"key":16,"text":17,"correct":14},"B","同一招标工程的项目编码不得有重复",{"key":19,"text":20,"correct":21},"C","分部分项工程量清单的项目名称可由编制者根据需要自行拟定",true,{"key":23,"text":24,"correct":14},"D","分部分项工程量清单中所列工程量中以平方米为单位应保留小数点两位","本题考核的是分部分项工程量清单的编制。分部分项工程量清单的项目编码应采用12位阿拉伯数字表示；同一招标工程的项目编码不得有重复；分部分项工程量清单的项目名称应按《建设工程工程量清单计价规范》附录的项目名称结合拟建工程的实际确定；以立方米、平方米、米、千克为单位的保留两位小数。C说法错误。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]