[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-90887":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},90887,64,1,"单选题","项目实施时可能发生的难以预料的支出和需要预先预留的费用，应列入建设工程造价的( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","基本预备费",true,{"key":16,"text":17,"correct":18},"B","建设单位开办费",false,{"key":20,"text":21,"correct":18},"C","工程费用",{"key":23,"text":24,"correct":18},"D","涨价预备费","此题考核的是基本预备费的概念",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]