[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-90883":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},90883,64,1,"单选题","措施项目是指为完成工程项目施工、发生于该工程施工准备和施工过程中的( )项目。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程暂列",false,{"key":16,"text":17,"correct":14},"B","工程实体",{"key":19,"text":20,"correct":21},"C","非工程实体",true,{"key":23,"text":24,"correct":14},"D","分部分项工程","该题考核的是措施项目的概念。措施项目是指非工程实体项目。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]