[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-90820":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},90820,64,1,"单选题","招标人按设计施工图纸计算的、对招标工程限定的最高工程造价，称为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","招标控制价",true,{"key":16,"text":17,"correct":18},"B","标底",false,{"key":20,"text":21,"correct":18},"C","施工图预算",{"key":23,"text":24,"correct":18},"D","施工预算","本题考核的是招标控制价的定义。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 建筑与房地产经济","经济金融",0]