[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1067157":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1067157,632,2,"多选题","在采用自营方式建造固定资产的情况下，下列项目中应计入固定资产取得成本的有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程项目耗用的工程物资",true,{"key":16,"text":17,"correct":14},"B","在建工程人员工资",{"key":19,"text":20,"correct":14},"C","生产车间为工程提供的水、电等费用",{"key":22,"text":23,"correct":24},"D","企业行政管理部门为组织和管理生产经营活动而发生的费用",false,"ABC","选项D，企业行政管理部门为组织和管理生产经营活动而发生的费用应计入管理费用。",{"id":6,"name":28,"category":29,"favorite":30},"卫生招聘 (财务)","医药卫生",0]