[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-81397":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},81397,62,2,"多选题","建筑工程保险的保险期限是自( )起，以先发生者为准。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程破土动工之日",true,{"key":16,"text":17,"correct":18},"B","签发保险单次日0时",false,{"key":20,"text":21,"correct":14},"C","被保险项目原材料等卸至工地时",{"key":23,"text":24,"correct":18},"D","签发保险单次日24时",{"key":26,"text":27,"correct":18},"E","工程保证期满时","AC","建筑工程保险的保险期限开始有两种情况：自工程破土动工之日或自被保险项目原材料等卸至工地时起，两者以先发生者为准。动工日包括打地基在内，若经被保险人要求也可从打完地基开始，但应在保单中注明。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 保险专业","经济金融",0]