[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-80941":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},80941,62,2,"多选题","建筑工程保险在理赔时，控制风险的方法主要有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","计算赔款时，若为重复保险，采用分摊方式",true,{"key":16,"text":17,"correct":14},"B","计算赔款时，若为足额或超额保险，按实际损失赔偿",{"key":19,"text":20,"correct":21},"C","在定损时，准确估算保险标的的全部损失即可",false,{"key":23,"text":24,"correct":14},"D","被保险人在索赔时，除提供事故报告外，还须提供一系列与之有关的证明，经严审 并查阅被保险人是否履行相应义务",{"key":26,"text":27,"correct":14},"E","在理赔时应当扣除相应的免赔额","ABDE","除ABDE四项外，建筑工程保险在理赔时，控制风险的方法还包括：①在现场 查勘定损时，要査勘出险的原因和经过，组织施救和整理工作，提取有关单证并拍摄 受损现场照片，分析风险事故是否属于保险事故，从而确定是否承担赔付责任；②在 定损时，要准确估算保险标的的全部损失、保险标的部分损失、施救整理费用、第三 者赔偿金额，以及现场必要的清除费用；③在计算赔款时，若为不足额保险，则采取 比例赔偿方式。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 保险专业","经济金融",0]