[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-80038":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},80038,62,1,"单选题","安装工程项目的保险金额按重置价值计算，应不超过整个工程项目保险金额的（），若超过（），则按安装工程保险费率计收保费；超过（）的，则应单独投保安装工程保险",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","20%，20%，60%",false,{"key":16,"text":17,"correct":18},"B","20%，20%，50%",true,{"key":20,"text":21,"correct":14},"C","10%，10%，50%",{"key":23,"text":24,"correct":14},"D","10%,20%,50%","安装工程项目的保险金额按重置价值计算，应不超过整个工程项目保险金额的20%，若超过20%，则按安装工程保险费率计收保费；超过50%的，则应单独投保安装工程保险.",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 保险专业","经济金融",0]