[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-608-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":657},{"id":5,"name":6,"category":7,"favorite":8},608,"项目决策分析与评价","建筑工程",0,9,50,1135,[13,34,52,67,82,97,109,124,136,148,160,172,187,201,213,225,237,249,264,276,290,300,312,320,332,344,359,373,385,397,410,422,434,446,458,470,485,497,506,518,530,542,554,568,579,594,606,618,630,645],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},941141,1,"单选题","社会评价涉及的社会因素一般可分为影响人类生活和行为的因素、影响社会环境变迁的因素和（ ）三类。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","影响经济发展的因素",false,{"key":24,"text":25,"correct":22},"B","影响生态环境的因素",{"key":27,"text":28,"correct":22},"C","影响投资环境的因素",{"key":30,"text":31,"correct":32},"D","影响社会稳定和发展的因素",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},941142,2,"多选题","阐述拟建项目社会稳定风险分析的主要结论，包括（）。",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"社会影响分析",{"key":24,"text":43,"correct":32},"拟建项目主要的风险因素",{"key":27,"text":45,"correct":22},"社会稳定风险计划实施的监测评估",{"key":30,"text":47,"correct":32},"落实风险防范、化解措施的有关建议",{"key":49,"text":50,"correct":32},"E","项目稳定风险应急预案、风险管理联动机制等建议","BDE",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},941143,"社会稳定风险调查应围绕拟建项目建设实施的()等方面展开，调查范围应覆盖所涉及地区的利益相关者，充分听取、全面收集群众和各利益相关者的意见，包括合理和不合理、现实和潜在的诉求等。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"必要性",{"key":24,"text":59,"correct":32},"合法性",{"key":27,"text":61,"correct":32},"合理性",{"key":30,"text":63,"correct":32},"可行性",{"key":49,"text":65,"correct":32},"可控性","BCDE",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":81,"analysis":33},941144,"关于社会评价和社会稳定分析的说法，正确的有()。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"两者均以社会调查、社会环境分析、社会风险分析为基础",{"key":24,"text":74,"correct":32},"两者的工作过程和工作内容基本相似",{"key":27,"text":76,"correct":22},"社会稳定风险分析要求全面分析项目对社会发展的正面影响和负面影响",{"key":30,"text":78,"correct":32},"社会稳定风险分析制度要求对造成较大或重大损失的建设项目依法追究有关责任人的责任",{"key":49,"text":80,"correct":22},"与社会评价相比，社会稳定风险分析的评价指标体系尚不完整和规范","BD",{"id":83,"libraryId":5,"type":36,"typeLabel":37,"stem":84,"options":85,"answer":96,"analysis":33},941145,"关于社会评价和社会稳定风险分析二者关系的说法，正确的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":32},"理论体系相同",{"key":24,"text":89,"correct":22},"分析角度一致",{"key":27,"text":91,"correct":32},"分析方法一致",{"key":30,"text":93,"correct":22},"社会管理功能一致",{"key":49,"text":95,"correct":32},"工作过程和内容相似","ACE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":20,"analysis":33},941148,"风险对照检查表主要用于风险分析程序的()阶段。",[101,103,105,107],{"key":20,"text":102,"correct":32},"风险识别",{"key":24,"text":104,"correct":22},"风险估计",{"key":27,"text":106,"correct":22},"风险评价",{"key":30,"text":108,"correct":22},"风险应对",{"id":110,"libraryId":5,"type":36,"typeLabel":37,"stem":111,"options":112,"answer":123,"analysis":33},941152,"下列行为中，属于风险转移的有()。",[113,115,117,119,121],{"key":20,"text":114,"correct":32},"签订发包合同",{"key":24,"text":116,"correct":22},"设立应急储备金",{"key":27,"text":118,"correct":22},"彻底改变项目原方案",{"key":30,"text":120,"correct":32},"发行股票筹集项目资金",{"key":49,"text":122,"correct":32},"在合同中列入免责条款","ADE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":24,"analysis":33},941153,"关于项目风险的说法，正确的是()。",[128,130,132,134],{"key":20,"text":129,"correct":22},"投资者不能主动接受项目的风险",{"key":24,"text":131,"correct":32},"概率树分析和蒙特卡洛模拟是风险分析的主要方法",{"key":27,"text":133,"correct":22},"项目风险不会带来收益",{"key":30,"text":135,"correct":22},"项目有关人员的主观判断不会形成风险",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":30,"analysis":33},941155,"风险评价的工作内容不包括()。",[140,142,144,146],{"key":20,"text":141,"correct":22},"确定风险评价基准",{"key":24,"text":143,"correct":22},"确定项目风险水平",{"key":27,"text":145,"correct":22},"确定项目风险等级",{"key":30,"text":147,"correct":32},"确定风险管理计划",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":30,"analysis":33},941160,"下列项目风险中，属于市场风险的是()。",[152,154,156,158],{"key":20,"text":153,"correct":22},"合作伙伴的专业性",{"key":24,"text":155,"correct":22},"产成品品质的好坏",{"key":27,"text":157,"correct":22},"项目组织机构的合理性",{"key":30,"text":159,"correct":32},"消费者偏好发生变化",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":30,"analysis":33},941161,"根据对项目不同方案的敏感性分析，下列说法正确的是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"敏感分析图纵轴为不确定因素的变化率",{"key":24,"text":167,"correct":22},"敏感分析图横轴为内部收益率的数值",{"key":27,"text":169,"correct":22},"项目某因素的与纵轴的交点即为临界点",{"key":30,"text":171,"correct":32},"项目敏感程度小，抗风险能力强",{"id":173,"libraryId":5,"type":36,"typeLabel":37,"stem":174,"options":175,"answer":186,"analysis":33},941163,"下列方法中，可以用于风险识别的方法有（ ）",[176,178,180,182,184],{"key":20,"text":177,"correct":32},"解析法",{"key":24,"text":179,"correct":32},"德尔菲法",{"key":27,"text":181,"correct":32},"风险评价表法",{"key":30,"text":183,"correct":32},"风险结构分解法",{"key":49,"text":185,"correct":22},"风险概率－影响矩阵法","ABCD",{"id":188,"libraryId":5,"type":36,"typeLabel":37,"stem":189,"options":190,"answer":96,"analysis":33},941164,"某项目设计生产能力为100 万吨。在达产年份，预计销售收入为4500 万元，固定成本为800 万元，可变成本为2450 万元，均不含增值税，销售税金及附加为50 万元，则下列说法正确的有（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":32},"生产负荷达到设计能力的40%，即可实现盈亏平衡",{"key":24,"text":194,"correct":22},"项目达到设计生产能力时的年利润为1250万元",{"key":27,"text":196,"correct":32},"年利润达到800万元时的产量是80万吨",{"key":30,"text":198,"correct":22},"维持盈亏平衡时产品售价最低可降至32.5元\u002F吨",{"key":49,"text":200,"correct":32},"项目单位产品的可变成本为24.5元\u002F吨",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},941165,"下列风险分析方法中，不属于专家调查法的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"头脑风暴法",{"key":24,"text":208,"correct":32},"风险解析法",{"key":27,"text":210,"correct":22},"风险对照检查表",{"key":30,"text":212,"correct":22},"风险识别调查表",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},941166,"行业和项目都有其特殊性，不同的行业和不同的项目具有不同的风险。这表明风险具有（ ）的特点。",[217,219,221,223],{"key":20,"text":218,"correct":22},"客观性",{"key":24,"text":220,"correct":22},"可变性",{"key":27,"text":222,"correct":22},"阶段性",{"key":30,"text":224,"correct":32},"多样性",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},941168,"计算盈亏平衡点时，下列说法不正确的是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"盈亏平衡点不能按计算期内的平均值计算",{"key":24,"text":232,"correct":22},"盈亏平衡点应按还款期间和还完借款后的年份分别计算",{"key":27,"text":234,"correct":22},"盈亏平衡点可以采用公式法和图解法求解",{"key":30,"text":236,"correct":32},"BEP（生产能力利用率）=BEP（产量）×计算期内生产能力平均值",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},941169,"关于建设项目风险的说法，正确的是()。",[241,243,245,247],{"key":20,"text":242,"correct":22},"不同阶段的风险基本相同",{"key":24,"text":244,"correct":32},"风险具有客观存在性",{"key":27,"text":246,"correct":22},"投机风险只能带来损失",{"key":30,"text":248,"correct":22},"自然灾害属于特殊风险",{"id":250,"libraryId":5,"type":36,"typeLabel":37,"stem":251,"options":252,"answer":263,"analysis":33},941170,"下列关于不确定性分析和风险分析的表述，正确的有()。",[253,255,257,259,261],{"key":20,"text":254,"correct":32},"通过风险分析可以求得各风险因素对投资项目影响发生的概率",{"key":24,"text":256,"correct":22},"不确定性分析可以分析出部分不确定因素影响发生的概率",{"key":27,"text":258,"correct":32},"通过敏感性分析可以知道影响项目效益的敏感因素及其敏感程度",{"key":30,"text":260,"correct":32},"敏感性分析找出的敏感因素可以作为概率分析风险因素的确定依据",{"key":49,"text":262,"correct":22},"敏感性分析与风险分析的区别在于两者的分析内容不同，但方法具有相同之处","ACD",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},941171,"项目经济评价往往需要对项目的风险与不确定性进行分析。下列关于风险与不确定性的说法，错误的是（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"风险是可以量化的",{"key":24,"text":271,"correct":32},"风险是不可保险的",{"key":27,"text":273,"correct":22},"不确定性的发生概率未知",{"key":30,"text":275,"correct":22},"不确定性可能影响更大",{"id":277,"libraryId":5,"type":36,"typeLabel":37,"stem":278,"options":279,"answer":263,"analysis":33},941172,"风险和不确定性是既相互联系，又相互区别的两个概念，两者间的区别表现在()。",[280,282,284,286,288],{"key":20,"text":281,"correct":32},"可否保险",{"key":24,"text":283,"correct":22},"可否定性分析",{"key":27,"text":285,"correct":32},"可否量化分析",{"key":30,"text":287,"correct":32},"概率可获得性",{"key":49,"text":289,"correct":22},"可否承受",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":30,"analysis":33},941173,"投资项目的有关各方可能会有不同的风险;同一风险因素对不同主体的影响也是不同的。这体现了风险的()特征。",[294,295,296,298],{"key":20,"text":218,"correct":22},{"key":24,"text":220,"correct":22},{"key":27,"text":297,"correct":22},"层次性",{"key":30,"text":299,"correct":32},"相对性",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},941174,"既可能带来损失，也可能产生利益的风险是()。",[304,306,308,310],{"key":20,"text":305,"correct":32},"投机风险",{"key":24,"text":307,"correct":22},"纯风险",{"key":27,"text":309,"correct":22},"自然风险",{"key":30,"text":311,"correct":22},"人为风险",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":30,"analysis":33},941175,"行业和项目都有其特殊性，不同的行业和不同的项目具有不同的风险。这表明风险具有()的特点。",[316,317,318,319],{"key":20,"text":218,"correct":22},{"key":24,"text":220,"correct":22},{"key":27,"text":222,"correct":22},{"key":30,"text":224,"correct":32},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":30,"analysis":33},941176,"下列有关建设项目敏感性分析的表述中，正确的是()。",[324,326,328,330],{"key":20,"text":325,"correct":22},"不确定因素的变动统一用百分数表示",{"key":24,"text":327,"correct":22},"全部不确定因素要同时进行变化",{"key":27,"text":329,"correct":22},"效益指标最少取三个",{"key":30,"text":331,"correct":32},"汇率是可以选取的不确定因素",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},941177,"某项目不确定因素为建设投资、运营负荷、销售价格和原材料价格，如果这四个因素分别向不利方向变化20％、15％、7％和10％，项目的财务内部收益率均等于财务基准收益率，该项目最敏感的因素是()。",[336,338,340,342],{"key":20,"text":337,"correct":22},"建设投资",{"key":24,"text":339,"correct":32},"销售价格",{"key":27,"text":341,"correct":22},"运营负荷",{"key":30,"text":343,"correct":22},"原材料价格",{"id":345,"libraryId":5,"type":36,"typeLabel":37,"stem":346,"options":347,"answer":358,"analysis":33},941178,"敏感性分析常用的财务分析指标有()。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"资产负债率",{"key":24,"text":351,"correct":22},"流动比率",{"key":27,"text":353,"correct":32},"内部收益率",{"key":30,"text":355,"correct":22},"速动比率",{"key":49,"text":357,"correct":32},"净现值","CE",{"id":360,"libraryId":5,"type":36,"typeLabel":37,"stem":361,"options":362,"answer":372,"analysis":33},941179,"项目敏感性分析中通常选取的不确定因素有()。",[363,365,367,369,370],{"key":20,"text":364,"correct":22},"计算期末残值",{"key":24,"text":366,"correct":32},"产出物价格",{"key":27,"text":368,"correct":32},"主要投入物价格",{"key":30,"text":337,"correct":32},{"key":49,"text":371,"correct":22},"流动资金","BCD",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},941180,"某项目采用的基准折现率为12%，其基本方案的财务内部收益率为16.2%，现假设投资增加10%时，财务内部收益率为13.9%，则建设投资增加10%的敏感度系数是()。",[377,379,381,383],{"key":20,"text":378,"correct":32},"-1.42",{"key":24,"text":380,"correct":22},"-0.16",{"key":27,"text":382,"correct":22},"0.16",{"key":30,"text":384,"correct":22},"1.58",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},941181,"关于敏感性分析中临界点的说法，正确的是()。",[389,391,393,395],{"key":20,"text":390,"correct":22},"临界点的高低与设定的基准收益率无关",{"key":24,"text":392,"correct":22},"敏感性分析图中，不确定因素临界点距纵轴越远说明该因素的敏感度越大",{"key":27,"text":394,"correct":32},"临界点可以通过敏感性分析图来求得近似值",{"key":30,"text":396,"correct":22},"不确定因素属于效益科目时，临界点为其提高的百分率率",{"id":398,"libraryId":5,"type":36,"typeLabel":37,"stem":399,"options":400,"answer":409,"analysis":33},941182,"下列指标中，可用于表示盈亏平衡点的指标通常有()。",[401,402,403,405,407],{"key":20,"text":353,"correct":22},{"key":24,"text":349,"correct":22},{"key":27,"text":404,"correct":22},"总投资收益率",{"key":30,"text":406,"correct":32},"产品销售价格",{"key":49,"text":408,"correct":32},"生产能力利用率","DE",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":30,"analysis":33},941183,"线性盈亏平衡分析的前提条件中不包括()。",[414,416,418,420],{"key":20,"text":415,"correct":22},"产量变化，产品售价不变",{"key":24,"text":417,"correct":22},"产量变化，单位可变成本不变",{"key":27,"text":419,"correct":22},"产量等于销售量",{"key":30,"text":421,"correct":32},"原材料价格不变",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},941184,"某项目的设计生产能力为3 万吨A 产品，单位产品价格为8000 元(不含税)，年总固定成本为4600 万元，单位产品可变成本为5200 元(不含税)，单位产品销售税金及附加为48元，经计算，以产量表示的盈亏平衡点为()吨。",[426,428,430,432],{"key":20,"text":427,"correct":22},"16429",{"key":24,"text":429,"correct":22},"16152",{"key":27,"text":431,"correct":32},"16715",{"key":30,"text":433,"correct":22},"16600",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},941185,"某项目达产第一年销售收入(含增值税)为10000 万元，总固定成本与总可变成本(含增值税)均为3000 万元，增值税为1453 万元，销售税金与附加为174 万元，则项目以生产能力利用率表示的盈亏平衡点为()。",[438,440,442,444],{"key":20,"text":439,"correct":22},"42.86%",{"key":24,"text":441,"correct":22},"43.95%",{"key":27,"text":443,"correct":32},"55.83%",{"key":30,"text":445,"correct":22},"56.05%",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},941186,"某投资项目达产后每年固定总成本4000万元，可变成本3500万元，营业收入与成本费用采用不含税价格表示，项目设计生产能力为3500台。若该项目的产品销售单价为5万元 \u002F台，营业税金及附加为400元\u002F台，则该项目年利润总额达到1500万元的最低年销售量为()台。",[450,452,454,456],{"key":20,"text":451,"correct":22},"1010",{"key":24,"text":453,"correct":32},"1389",{"key":27,"text":455,"correct":22},"1512",{"key":30,"text":457,"correct":22},"1815",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},941187,"某项目以生产能力利用率表示的盈亏平衡点为50%，根据盈亏平衡点的计算公式判断，若销售收入提高，其它条件不变，盈亏平衡点也会发生变化，变化后的数值更接近于()。",[462,464,466,468],{"key":20,"text":463,"correct":32},"45%",{"key":24,"text":465,"correct":22},"55%",{"key":27,"text":467,"correct":22},"58%",{"key":30,"text":469,"correct":22},"60％",{"id":471,"libraryId":5,"type":36,"typeLabel":37,"stem":472,"options":473,"answer":484,"analysis":33},941188,"关于建设项目盈亏平衡分析及盈亏平衡点的计算和评价的说法，正确的有()。",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"盈亏平衡分析适用于经济分析",{"key":24,"text":477,"correct":22},"盈亏平衡分析应重点测算运营期第一年的盈亏平衡点",{"key":27,"text":479,"correct":32},"盈亏平衡点的计算也可采用含增值税价格",{"key":30,"text":481,"correct":32},"用产量表示的盈亏平衡点越低，则抗风险能力越强",{"key":49,"text":483,"correct":32},"还款期间的盈亏平衡点通常要高于还清借款后年份的盈亏平衡点","CDE",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},941189,"下列关于投资项目经济评价中盈亏平衡分析的说法，正确的是()。",[489,491,493,495],{"key":20,"text":490,"correct":22},"在盈亏平衡点上，项目的净现值为0",{"key":24,"text":492,"correct":22},"盈亏平衡点越高，企业的抗风险能力越强",{"key":27,"text":494,"correct":32},"盈亏平衡分析只适用于财务分析",{"key":30,"text":496,"correct":22},"盈亏平衡点应按项目计算期内的平均数据计算",{"id":498,"libraryId":5,"type":36,"typeLabel":37,"stem":499,"options":500,"answer":96,"analysis":33},941190,"某项目设计生产能力为100 万吨。在达产年份，预计销售收入为4500 万元，固定成本为800 万元，可变成本为2450 万元，均不含增值税，销售税金及附加为50 万元，则下列说法正确的有()。",[501,502,503,504,505],{"key":20,"text":192,"correct":32},{"key":24,"text":194,"correct":22},{"key":27,"text":196,"correct":32},{"key":30,"text":198,"correct":22},{"key":49,"text":200,"correct":32},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":27,"analysis":33},941191,"某项目的设计生产能力为年产800万件产品，达产后的年固定成本为6500万元，年可变成本为3000万元，年销售收入为13000万元，年销售税金及附加为345万元，销售收入和成本费用均采用不含税价格，该项目年利润达到2000万元时的最低产量为()万件。",[510,512,514,516],{"key":20,"text":511,"correct":22},"507.1",{"key":24,"text":513,"correct":22},"680.0",{"key":27,"text":515,"correct":32},"704.3",{"key":30,"text":517,"correct":22},"707.6",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":30,"analysis":33},941192,"关于敏感性分析的说法，正确的是()。",[522,524,526,528],{"key":20,"text":523,"correct":22},"敏感性分析仅适用于财务分析",{"key":24,"text":525,"correct":22},"敏感程度表明了敏感因素发生的概率",{"key":27,"text":527,"correct":22},"敏感度系数与不确定因素的变化率无关",{"key":30,"text":529,"correct":32},"多因素敏感性分析是对同时改变两个或两个以上因素的情况进行分析",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},941193,"关于项目敏感性分析中敏感度系数的说法，正确的是()。",[534,536,538,540],{"key":20,"text":535,"correct":22},"敏感度系数趋于零，表示不确定因素的发生概率低",{"key":24,"text":537,"correct":32},"敏感度系数大于零，表示评价指标与不确定因素同方向变化",{"key":27,"text":539,"correct":22},"敏感度系数的计算结果与不确定因素的变化率无关",{"key":30,"text":541,"correct":22},"计算敏感度系数的目的是找出不确定因素的极限变化",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},941194,"某项目基本方案的财务内部收益率为15%，对应的原材料价格为8000 元\u002F吨，若原材料价格为9000 元\u002F吨，则该项目的财务内部收益率为12%，该财务内部收益率指标对项目原材料价格的敏感度系数为()。",[546,548,550,552],{"key":20,"text":547,"correct":22},"1.8",{"key":24,"text":549,"correct":32},"-1.6",{"key":27,"text":551,"correct":22},"-1.8",{"key":30,"text":553,"correct":22},"-2.0",{"id":555,"libraryId":5,"type":36,"typeLabel":37,"stem":556,"options":557,"answer":409,"analysis":33},941195,"下列关于敏感性分析的表述，正确的有()。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"敏感性分析可以得知不确定因素对项目效益的影响发生的可能性有多大",{"key":24,"text":561,"correct":22},"敏感性分析是投资项目经济评价中应用十分广泛的一种技术",{"key":27,"text":563,"correct":22},"敏感性分析中不确定因素变化程度的取值十分重要，借助它可较准确地计算敏感度系数和临界点",{"key":30,"text":565,"correct":32},"敏感性分析可为风险分析打下基础",{"key":49,"text":567,"correct":32},"财务评价中敏感性分析必选的指标是项目财务内部收益率",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":30,"analysis":33},941196,"进行项目的线性盈亏平衡分析应符合一定的假设条件。下列关于这些假设条件的说法，错误的是（ ）。",[572,573,575,577],{"key":20,"text":419,"correct":22},{"key":24,"text":574,"correct":22},"总成本费用是产量的线性函数",{"key":27,"text":576,"correct":22},"销售收入是销售量的线性函数",{"key":30,"text":578,"correct":32},"不同产品的负荷率可以各自变化",{"id":580,"libraryId":5,"type":36,"typeLabel":37,"stem":581,"options":582,"answer":593,"analysis":33},941197,"下列关于投资项目风险概率估计方法的表述中，正确的有()。",[583,585,587,589,591],{"key":20,"text":584,"correct":32},"客观概率估计方法只能用于完全可重复事件",{"key":24,"text":586,"correct":32},"主观概率反映了人们对风险现象的一种测度",{"key":27,"text":588,"correct":22},"客观概率估计方法的最大优点是仅需要少量的信息",{"key":30,"text":590,"correct":32},"主观概率估计适用于不可能进行试验的情况",{"key":49,"text":592,"correct":22},"主观概率是人们根据实际观测的数据估算出来的概率","ABD",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":30,"analysis":33},941198,"某投资项目在三种前景下的净现值和发生概率如下表所示，按该组数据计算的净现值期望值为()元。",[598,600,602,604],{"key":20,"text":599,"correct":22},"25000",{"key":24,"text":601,"correct":22},"37500",{"key":27,"text":603,"correct":22},"66667",{"key":30,"text":605,"correct":32},"75000",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":20,"analysis":33},941199,"风险分析程序包括①风险对策、②风险估计、③风险评价、④风险识别等步骤。这些步骤的先后顺序是()。",[610,612,614,616],{"key":20,"text":611,"correct":32},"④-②-③-①",{"key":24,"text":613,"correct":22},"①-④-②-③",{"key":27,"text":615,"correct":22},"④-③-②-①",{"key":30,"text":617,"correct":22},"④-②-①-③",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":30,"analysis":33},941200,"关于风险率估计的说法，正确的是()。",[622,624,626,628],{"key":20,"text":623,"correct":22},"主观概率估计只能用于完全可重复事件",{"key":24,"text":625,"correct":22},"标准差是描述风险变量偏离期望值程度的相对指标",{"key":27,"text":627,"correct":22},"离散系数是描述风险变量偏离期望值程度的绝对指标",{"key":30,"text":629,"correct":32},"概率树分析适用于变量取值个数有限的输入变量",{"id":631,"libraryId":5,"type":36,"typeLabel":37,"stem":632,"options":633,"answer":644,"analysis":33},941201,"关于概率分析的说法，正确的有()。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"通常假定输入变量之间是相关的",{"key":24,"text":637,"correct":22},"净现值小于零的概率越接近于1，风险越小",{"key":27,"text":639,"correct":32},"净现值期望值为各加权净现值之和",{"key":30,"text":641,"correct":32},"该方法不适于输入变量存在相互关联的情况",{"key":49,"text":643,"correct":22},"评价指标通常按由大到小的顺序排列计算累计概率","CD",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":30,"analysis":33},941202,"某项目在主要风险变量的不同情况下，可能发生事件对应的财务净现值及其概率如下表所示，则该项目净现值大于或等于零的累积概率为()。",[649,651,653,655],{"key":20,"text":650,"correct":22},"0.62",{"key":24,"text":652,"correct":22},"0.64",{"key":27,"text":654,"correct":22},"0.66",{"key":30,"text":656,"correct":32},"0.69",[658,661,664,667,670,673],{"id":15,"name":659,"category":7,"favorite":660},"领导干部任职前廉政法规知识测试题",92,{"id":662,"name":663,"category":7,"favorite":15},595,"建筑结构与设备",{"id":665,"name":666,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":668,"name":669,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":671,"name":672,"category":7,"favorite":8},534,"BIM工程师",{"id":674,"name":672,"category":7,"favorite":8},535]